Willowbrook, Cardiff

Client:    Cardiff Council

Sector:          Residential

Value:           £20m

Cambria Consulting were appointed Civil and Structural Engineers for the first phase of the Cardiff Living Development Partnership between Cardiff Council and Wates Residential. The Willowbrook West site is the largest of the Phase 1 developments, delivering 192 new residential units on a greenfield site in St Mellons.

The site presented a number of challenges; with a section of the southern area of the site designated in a flood zone, there are a number of watercourses & reens along the site’s boundaries, numerous PROW routes traverse the site, and there are a number of mature tree lines. To allow development, Cambria obtained several ordinary watercourse consents to divert and culvert the watercourses to enable both permanent and temporary access routes into the site. A S247 Stopping up Order was obtained from WAG for the existing highway land on the site, which was no longer used, and the PROW routes were diverted via a S257 agreement to align with the new proposed street layouts.

Cambria designed all the Sustainable Drainage Systems (SuDS) which were incorporated into the surface water drainage scheme, the run-off from the site being restricted to the QBar Greenfield run-off rate with all attenuation provided by a pond and wetland area in the southern corner of the site. A pond dipping deck and soft landscaping have ensured that the pond also provides amenity and biodiversity benefits to the development. Cambria also secured all the required S38 Agreements, S104 Drainage Agreements from the Local Highway Authority and Welsh Water respectively.

< Back to Case Studies

Latest News View all

We’re Hiring!

Structural Engineers, we’re hiring, and we want the best! Our Bristol office is growing, and we need an excellent Engineer to become a key member of our team. Click here to find out… Read more »

Cambria attend The Food Works ‘Steel Signing’ Ceremony

On 29th May 2019, our Practice Secretary, Trish attended her first ‘steel signing’ ceremony at The Food WorksSW site representing Cambria who are providing full Civil and Structural consultancy services on this project… Read more »

Cambria join forces with Penarth Marina Litterpickers!

Cambria have joined forces with Penarth Marina Litterpickers to get involved in regular litter picks in the vicinity of our Penarth Office. A few of the Cambria team took part in their first… Read more »

Proud to Be Part of an Award Winning Design Team…

Cambria were delighted to hear the news from the LABC Cymru Building Excellence Awards for NPT Council held on Friday 22 February 2019, that Ysgol Cwm Brombil won Best Educational Building and Ysgol… Read more »

Cambria ‘SuDs in Wales 2019’ Lecture

Cambria infrastructure team were invited by the Institution of Structural Engineers to present their ‘SuDs in Wales 2019’ lecture. The lecture was held on at 4:30pm on Wednesday 16th January at the North… Read more »

Merry Christmas from all at Cambria!

Cambria supports Hope Rescues Cosy Kennels Shoebox Appeal

After the successful contribution made by our team to the Reverse Advent for Newport Foodbank last year, this year we decided to do something a little different! This year, we chose to support… Read more »

ICE Engineering Team Challenge 2018

Our Callum Parker and Trish Michael both volunteered to help out at the ICE Engineering Team Challenge at the Cardiff event on the 5th November and Newport on the 6th November 2018. Callum… Read more »