Retaining Structures

In order to maximise the developable area on sites it is often necessary to provide retaining walls to deliver steep changes to ground levels, which cannot be achieved with the natural ground. Traditionally retaining walls of any significant height would have been constructed of Reinforced Concrete (3.2.6) but there are now a variety of options to choose from which will usually deliver considerable cost savings compared to the RC option.

We believe that the best way to establish which retaining wall solution is the most cost effective soutionfor a particular location and set of ground conditions is to design a number of bespoke options and for each of these to be costed by the contractor or QS. We are therefore experienced in designing the widest range of ground retaining structures including:

  • Reinforced Concrete Retaining Walls
  • Gabion Walls
  • Mass Blockwork
  • Reinforced Brickwork/Blockwork
  • Natural Timber Post Walls
  • Pre-cast Concrete Sectional Walls
  • Soil Nailing
  • Tied and Free Standing Crib Walling


< Back to Services

Latest News View all

We’re Hiring!

Structural Engineers, we’re hiring, and we want the best! Our Bristol office is growing, and we need an excellent Engineer to become a key member of our team. Click here to find out… Read more »

Cambria attend The Food Works ‘Steel Signing’ Ceremony

On 29th May 2019, our Practice Secretary, Trish attended her first ‘steel signing’ ceremony at The Food WorksSW site representing Cambria who are providing full Civil and Structural consultancy services on this project… Read more »

Cambria join forces with Penarth Marina Litterpickers!

Cambria have joined forces with Penarth Marina Litterpickers to get involved in regular litter picks in the vicinity of our Penarth Office. A few of the Cambria team took part in their first… Read more »

Proud to Be Part of an Award Winning Design Team…

Cambria were delighted to hear the news from the LABC Cymru Building Excellence Awards for NPT Council held on Friday 22 February 2019, that Ysgol Cwm Brombil won Best Educational Building and Ysgol… Read more »

Cambria ‘SuDs in Wales 2019’ Lecture

Cambria infrastructure team were invited by the Institution of Structural Engineers to present their ‘SuDs in Wales 2019’ lecture. The lecture was held on at 4:30pm on Wednesday 16th January at the North… Read more »

Merry Christmas from all at Cambria!

Cambria supports Hope Rescues Cosy Kennels Shoebox Appeal

After the successful contribution made by our team to the Reverse Advent for Newport Foodbank last year, this year we decided to do something a little different! This year, we chose to support… Read more »

ICE Engineering Team Challenge 2018

Our Callum Parker and Trish Michael both volunteered to help out at the ICE Engineering Team Challenge at the Cardiff event on the 5th November and Newport on the 6th November 2018. Callum… Read more »