Remediation Strategies

In the event of a site being proven to be contaminated to the extent that it is considered to be a potential hazard, the appropriate mitigation measures need to be undertaken to effectively eliminate that risk. We have considerable experience of working with specialist teams with the sole purpose of reducing all known contamination related risks at minimum costs using a range of techniques which have been approved by the Environment Agency. Traditionally this would have meant the digging up of the contaminated material and its removal from site to a licensed tip however, in recent years this has become prohibitively expensive and is now considered to be very much a last resort. Alternative solutions which we have used to enable contaminated land to be safely developed include specifying:

  • Permanent Encapsulation
  • Impervious Capping Layers
  • Ground Modification Works such as by Lime or Cement Stabilisation.
  • The Provision of Semi Reactive Barriers
  • Phytoremediation
  • Soil Washing
  • Photolysis

The above methods plus others offer cost effective remedial measures, which can be tailored to suit the specific contaminative characteristics of a particular site.


< Back to Services

Latest News View all

We’re Hiring!

Structural Engineers, we’re hiring, and we want the best! Our Bristol office is growing, and we need an excellent Engineer to become a key member of our team. Click here to find out… Read more »

Cambria attend The Food Works ‘Steel Signing’ Ceremony

On 29th May 2019, our Practice Secretary, Trish attended her first ‘steel signing’ ceremony at The Food WorksSW site representing Cambria who are providing full Civil and Structural consultancy services on this project… Read more »

Cambria join forces with Penarth Marina Litterpickers!

Cambria have joined forces with Penarth Marina Litterpickers to get involved in regular litter picks in the vicinity of our Penarth Office. A few of the Cambria team took part in their first… Read more »

Proud to Be Part of an Award Winning Design Team…

Cambria were delighted to hear the news from the LABC Cymru Building Excellence Awards for NPT Council held on Friday 22 February 2019, that Ysgol Cwm Brombil won Best Educational Building and Ysgol… Read more »

Cambria ‘SuDs in Wales 2019’ Lecture

Cambria infrastructure team were invited by the Institution of Structural Engineers to present their ‘SuDs in Wales 2019’ lecture. The lecture was held on at 4:30pm on Wednesday 16th January at the North… Read more »

Merry Christmas from all at Cambria!

Cambria supports Hope Rescues Cosy Kennels Shoebox Appeal

After the successful contribution made by our team to the Reverse Advent for Newport Foodbank last year, this year we decided to do something a little different! This year, we chose to support… Read more »

ICE Engineering Team Challenge 2018

Our Callum Parker and Trish Michael both volunteered to help out at the ICE Engineering Team Challenge at the Cardiff event on the 5th November and Newport on the 6th November 2018. Callum… Read more »